News
Supreme Group is pleased to announce that it is combining it's construction capabilities with the modular design expertise of Fluor Corporation
Supreme Group is pleased to announce that it is combining it's construction capabilities with the modular design expertise of Fluor Corporation to operate and deliver a full range of unique module assembly and fabrication services to the Canadian market place. Read the link for more.
Supreme Group Links EIA to new Renaissance Hotel
Click the link to read more about Supreme Groups involvement at the new pedway at EIA.
President and COO of Supreme Group featured in Edmonton Journal article
John Leder, President and COO of Supreme Group, was featured in an article in the Edmonton Journal, written by Gary Lamphier. Click the link to read more!
Supreme Group Announces Full Integration of Pro-V Mfg. Inc.
Supreme Group is pleased to announce the completion of the full acquisition of Pro-V Mfg. Inc. [Pro-V]. As of January 1st, 2013, Pro-V’s operations located at #5, 53016 Highway 60, Acheson, Alberta, became Pro-V Manufacturing LP, as a strategically integrated member of the Supreme Group.
Supreme Group awarded Canada’s first Girder-Slab® method of construction for its work on Edmonton’s Courtyard Marriott Hotel
For Supreme Group, an opportunity to be involved in a third consecutive project for the ongoing expansions at the Edmonton
International Airport was reason enough to propose innovative ideas with the owner and design team assembled for the planned 178,000 sq. ft. Courtyard Marriott Hotel.
Supreme Group Hosts Steel Day 2012 Events
Supreme Group Hosts Steel Day 2012 Events
Steel Day 2012, which takes place on September 28th, 2012, is hosted by the Canadian Institute of Steel Construction, American Institute of Steel Construction and the structural steel industry. This is the third annual national event dedicated to providing accessibility to the latest happenings in the structural steel industry.
Supreme Group Honours Staff at Annual Golf Tournament
On August 10th, our staff enjoyed the Supreme Group Annual Golf Tournament and BBQ. We hold this every year to honour our amazing employees for all of the tremendous results we've achieved together over the years, and to acknowledge them for all their hard work and dedication to Supreme Group.
Supreme Group announces the Top-out of Canada's first Girder-Slab® awarded project
Edmonton International Airport – Courtyard Marriott Hotel Top-out
July 18th, 2012
Supreme Group is pleased to announce the Top-out of Canada’s first Girder-Slab® awarded project. The Girder-Slab® system of construction is a steel and pre-cast composite floor plate method for the multi-storey residential market. It comprises the marrying of hollow-core planking within a unique steel profile within the floor depth to allow for low floor-to-floor height construction critical for such facilities.
Canadian Institute of Steel Construction Announces Winners of the 2012 CISC National Steel Design Awards
Winning projects showcase the engineering feats, architectural versatility and sustainability features that are possible with steel.
The Canadian Institute of Steel Construction (CISC) announced the winners of its biennial National Steel Design Awards competition during its Annual General Meeting & Convention in Ottawa last week.
The prestigious CISC National Steel Design Awards are open to architects, engineers, developers, owners, contractors and other stakeholders involved with a building, bridge, industrial or other steel work project in which engineering demands, architectural considerations or sustainability requirements influenced the designer's choice of steel as the most appropriate structural solution.
Supreme Group Featured in AlbertaMetal.ca Article
"A series of strategic acquisitions is one of the tried and true ways for a company to grow its business. The Supreme Group has been applying this approach recently with the goal of positioning the company for the anticipated industrial priorities in the coming years."


